Project Reference
BESS designed to support local PV.
Adore Energy · Bulgaria
Adore Energy
Client
Bulgaria
Location
232 kWh
Energy Capacity
115 kW
On-Grid Power
A plastics factory in Bulgaria with a 300 kWp rooftop solar installation was not using all of its generated solar energy. When production did not consume everything generated, the surplus fed into the grid at rates that did not justify the solar investment. Integrating a battery storage system resolves this by capturing excess energy to maximise PV yield.
Technical Specification
Technical Details.
Full Project Delivery
Scope of Work.
Volthein delivered the full project lifecycle for the Adore Energy BESS β from consulting and engineering through installation and integration, to commissioning and ongoing asset management.
Operate with confidence.
Pre-engineered BESS blocks in three configurations β ESSENTIAL, STANDARD and PERFORMANCE. Fixed pricing, faster time to revenue, and target 99% availability.
isn't enough.
Fully engineered BESS for projects with complex site constraints, non-standard interfaces, or specific control requirements β configurable within a validated framework.
FEATURED PROJECTS.












One Response