BESS designed to support a natural gas power plant.

VEOLIA  ·  Slovakia

VEOLIA

Client

Slovakia

Location

2 914 kWh

Energy Capacity

5 600 kW

On-Grid Power

A battery energy storage system that collaborates with the plant's turbines to provide ancillary services for grid stability (aFRR ±) and black-start backup. Without the battery, operations would be technically limited in the services provided and economically disadvantageous due to the high fluctuations in turbine operation.

VEOLIA project, Slovakia

The Site

Challenges & Solutions.

The battery storage system was deliberately over-dimensioned to guarantee the energy needed to smooth deviations in the designated services with the smallest possible capacity, while accounting for capacity degradation over time to secure long-term service delivery. During implementation, the challenge was integrating the whole system into a complex gas power plant without compromising its operation — building a new connection and substation for the local grid and developing a solution for seamless cooperation with the plant-wide microgrid SCADA system.

Technical Specification

Technical Details.

Battery Type
Li-ion NMC LG Chem
PCS Type
2× Power Electronics Freemaq PCSK
Execution
2021–2023
Functionalities
aFRR+, black start
System Voltage Output
22 kV
Status
In Operation

Full Project Delivery

Scope of Work.

Volthein delivered the project lifecycle for the VEOLIA BESS — from consulting and engineering through grid integration and EMS, to commissioning and grid compliance.

Step 01
Consulting & Engineering
System sizing, single-line design and the certification-ready technical package.
1
Step 02
System Procurement & FAT
Vendor-neutral sourcing of the batteries and power conversion, with factory acceptance testing.
2
Step 03
Grid Integration & EPC
Foundations, MV/LV works and grid connection through the project's substations.
3
Step 04
EMS & Control Systems
EMS/SCADA integration and activation of the contracted grid and market services.
4
Step 05
Commissioning & Grid Compliance
SAT, grid-code compliance verification and handover into operation.
5
Step 06
After-Sales & Asset Management
Monitoring, service and availability warranties over the system lifetime.
6
OUR REFERENCES

FEATURED PROJECTS.

Powerfield, Netherlands
BESS - 52.9 MWh

Powerfield, Netherlands

View Details
Ferlach, Austria
BESS - 5.6 MWh

Ferlach, Austria

View Details
EIF, Slovakia
BESS - 5.2 MWh

EIF, Slovakia

View Details
MaxSolar, Germany
BESS - 4.8 MWh

MaxSolar, Germany

View Details
VEOLIA, Slovakia
BESS - 2.9 MWh

VEOLIA, Slovakia

View Details
SUAS Grid, Czechia
BESS - 7.5 MWh

SUAS Grid, Czechia

View Details
Synecotec, Austria
BESS - 556 kWh

Synecotec, Austria

View Details
PakDeZon, Netherlands
BESS - 558 kWh

PakDeZon, Netherlands

View Details
Adore Energy, Bulgaria
BESS - 232 kWh

Adore Energy, Bulgaria

View Details
ZELPO, Slovakia
PV - 2.6 MWp

ZELPO, Slovakia

View Details
Schaeffler, Slovakia
PV - 498.5 kWp

Schaeffler, Slovakia

View Details
ECO PACK, Slovakia
BESS - 302 kWh

ECO PACK, Slovakia

View Details
Volthein contact person

GOT A PROJECT IN MIND?

Let's Talk