Project Reference

BESS designed for flexibility trading.

Ferlach  ·  Austria

Ferlach

Client

Austria

Location

5Β 644 kWh

Energy Capacity

2Β 000 kW

On-Grid Power

Ferlach 1 is a 2 MW / 5.6 MWh battery storage system near Ferlach in southern Austria, built by Volthein to expand its presence in Central Europe. It strengthens grid stability and supports Austria's shift to renewables by responding quickly to power fluctuations and automatically restoring grid balance. It also optimises energy use through price arbitrage β€” storing electricity when it is abundant and releasing it during peak demand, reducing the need for conventional generation.

Ferlach project, Austria

The Site

Challenges & Solutions.

The project presented a unique engineering challenge: installing heavy battery and inverter hardware into a pre-determined space within an existing EV charging facility for caravans. Roof-construction limits meant that positioning the heavy technology safely required precise team coordination to protect both the building structure and the equipment.

Technical Specification

Technical Details.

Battery Type
CATL EnerX 530 Ah 0.5C
PCS Type
Power Electronics PCSK
Execution
2025–2026
Functionalities
FCR, aFRR, price arbitrage, cooperation with PV
System Voltage Output
20 kV
Status
In Operation

Full Project Delivery

Scope of Work.

Volthein delivered the full project lifecycle for the Ferlach BESS β€” from consulting and engineering through grid integration and EMS, to commissioning, grid compliance and ongoing asset management.

Step 01
Consulting & Engineering
System sizing, single-line design and the certification-ready technical package.
1
Step 02
System Procurement & FAT
Vendor-neutral sourcing of the batteries and power conversion, with factory acceptance testing.
2
Step 03
Grid Integration & EPC
Foundations, MV/LV works and grid connection through the project's substations.
3
Step 04
EMS & Control Systems
EMS/SCADA integration and activation of the contracted grid and market services.
4
Step 05
Commissioning & Grid Compliance
SAT, grid-code compliance verification and handover into operation.
5
Step 06
After-Sales & Asset Management
Monitoring, service and availability warranties over the system lifetime.
6
OUR REFERENCES

FEATURED PROJECTS.

Powerfield, Netherlands
BESS - 52.9 MWh

Powerfield, Netherlands

View Details
Ferlach, Austria
BESS - 5.6 MWh

Ferlach, Austria

View Details
EIF, Slovakia
BESS - 5.2 MWh

EIF, Slovakia

View Details
MaxSolar, Germany
BESS - 4.8 MWh

MaxSolar, Germany

View Details
VEOLIA, Slovakia
BESS - 2.9 MWh

VEOLIA, Slovakia

View Details
SUAS Grid, Czechia
BESS - 7.5 MWh

SUAS Grid, Czechia

View Details
Synecotec, Austria
BESS - 556 kWh

Synecotec, Austria

View Details
PakDeZon, Netherlands
BESS - 558 kWh

PakDeZon, Netherlands

View Details
Adore Energy, Bulgaria
BESS - 232 kWh

Adore Energy, Bulgaria

View Details
ZELPO, Slovakia
PV - 2.6 MWp

ZELPO, Slovakia

View Details
Schaeffler, Slovakia
PV - 498.5 kWp

Schaeffler, Slovakia

View Details
ECO PACK, Slovakia
BESS - 302 kWh

ECO PACK, Slovakia

View Details
Volthein contact person

GOT A PROJECT IN MIND?

Let's Talk