Project Reference
Synecotec · Austria
Synecotec
Client
Austria
Location
556 kWh
Energy Capacity
184 kW
On-Grid Power
The customer, a cable-car operator in Austria, faced challenges managing dynamic energy demand. Running the cable car requires substantial power and drove high electricity bills. The BESS acts as the βmusclesβ of the system β storing excess energy from the site's PV panels and deploying it when needed. Because the cable car's demand changes rapidly and unexpectedly, the BESS's fast response keeps it running smoothly, cuts grid reliance and lowers electricity costs.
The Site
The key challenge was installing the battery storage system at an altitude of 1,500 metres, inside the former cable-car operations building. The remote location and the difficulty of transporting and positioning the equipment at that height created significant logistical demands.
Technical Specification
Full Project Delivery
Volthein delivered the project lifecycle for the Synecotec BESS β from consulting and engineering through installation and integration, to commissioning and grid compliance.
Pre-engineered BESS blocks in three configurations β ESSENTIAL, STANDARD and PERFORMANCE. Fixed pricing, faster time to revenue, and target 99% availability.
Fully engineered BESS for projects with complex site constraints, non-standard interfaces, or specific control requirements β configurable within a validated framework.