Ferlach 1 is a 2 MW / 5.6 MWh battery storage system near Ferlach in southern Austria, built by Volthein to expand its presence in Central Europe. It strengthens grid stability and supports Austria's shift to renewables by responding quickly to power fluctuations and automatically restoring grid balance. It also optimises energy use through price arbitrage β storing electricity when it is abundant and releasing it during peak demand, reducing the need for conventional generation.
The Site
The project presented a unique engineering challenge: installing heavy battery and inverter hardware into a pre-determined space within an existing EV charging facility for caravans. Roof-construction limits meant that positioning the heavy technology safely required precise team coordination to protect both the building structure and the equipment.
Technical Specification
Full Project Delivery
Volthein delivered the full project lifecycle for the Ferlach BESS β from consulting and engineering through grid integration and EMS, to commissioning, grid compliance and ongoing asset management.
Pre-engineered BESS blocks in three configurations β ESSENTIAL, STANDARD and PERFORMANCE. Fixed pricing, faster time to revenue, and target 99% availability.
Fully engineered BESS for projects with complex site constraints, non-standard interfaces, or specific control requirements β configurable within a validated framework.