Project Reference
Powerfield Β· Netherlands
Powerfield
Client
Netherlands
Location
52 923.4 kWh
Energy Capacity
21 000 kW
On-Grid Power
Battery storage system consisting of 14 independently operable units installed next to a large photovoltaic power plant. The system provides multiple functionalities tied to the operation of the PV plant, as well as services directly for the grid operator.
The Site
The battery storage system is installed on a former farm waste dump, in an area with a high groundwater level. This made preparing the foundations and a suitable sub-grade for installation a challenge. The solution combined smaller concrete foundations with a metallic support platform. The entire system is powered through newly built substations (10.5 kV) integrated into the local grid.
Technical Specification
Full Project Delivery
Volthein delivered the full project lifecycle for the Powerfield BESS β from consulting and engineering through grid integration and EMS, to commissioning and grid compliance.
Pre-engineered BESS blocks in three configurations β ESSENTIAL, STANDARD and PERFORMANCE. Fixed pricing, faster time to revenue, and target 99% availability.
Fully engineered BESS for projects with complex site constraints, non-standard interfaces, or specific control requirements β configurable within a validated framework.