General Dubai Islands, UAE

Sustainable Island Power:
A Microgrid Solution with BESS.

24/7
Operation Time
35GWh
Yearly Consumption
4.5MW
Diesel Replaced
5days
H₂ Autonomy
The Challenge

REPLACING DIESEL WITH A FULLY RENEWABLE ISLAND MICROGRID.

A cluster of islands in Dubai required energy infrastructure built entirely from scratch. Hotel complexes were being constructed with 35 GWh yearly consumption and 24/7 operation — with only 4.5 MW diesel generators as the existing energy source.

Diesel logistics to remote islands are costly, unreliable and ecologically unacceptable. The goal was clear: design a sustainable island microgrid powered entirely by renewable energy — with BESS and hydrogen storage ensuring round-the-clock reliability without any grid connection.

The entire system is operated through an advanced EMS that forecasts production, manages storage dispatch, and optimizes Total Cost of Energy (TCOE).

Eliminate dependency on costly diesel logistics
Deliver a green, self-sufficient energy system
Ensure 24/7 reliability in a fully isolated environment
Project Specs
Client
Hotel Complex Developer
Location
Dubai Islands, UAE
Grid Connection
None — fully isolated island
Annual Consumption
35 GWh
Existing Source
4.5 MW diesel generators
Sector
Hospitality · Tourism
Application
Off-Grid Microgrid · Solar + BESS + H₂
"

The goal: design a sustainable island microgrid powered entirely by clean, renewable solar energy.

The Solution

SOLAR + BESS + HYDROGEN — A FULLY RENEWABLE ISLAND SYSTEM.

Volthein designed a multi-layer renewable microgrid combining high-yield solar PV, BESS for daily cycling, hydrogen for multi-day autonomy, and existing diesel generators retained only as last-resort backup — all managed by a single EMS.

01
1,725kWh/kWp
Rooftop + Tracker PV
  • Primary renewable electricity source
  • High yield: up to 1,725 kWh/kWp annually
  • Rooftop + ground tracker installation
  • Feeds direct load and BESS / H₂ charging
03
1MW / 2,500kg
Hydrogen System
  • Long-term storage in hydrogen tanks
  • Sustains 5 days of full island operation
  • Fuel cell reconverts H₂ into electricity
  • Seasonal buffer for extended low-solar periods
04
4.5MW
Diesel Generators (Existing)
  • Retained only as last-resort backup for redundancy
  • Not used under normal operating conditions
  • Final safety layer — ensures zero downtime under any failure scenario
Project Results

WHAT THE SYSTEM DELIVERS.

0%
Diesel Dependency
Existing 4.5 MW diesel generators replaced as primary source — retained only as last-resort emergency backup.
5days
H₂ Autonomy
Hydrogen storage sustains full island operation for 5 days without any solar generation — unique long-term buffer.
14MWh
Battery Storage
BESS handles day-to-night energy shifting and grid stabilization — maintaining frequency, voltage and power factor 24/7.
3layers
Storage Redundancy
BESS daily cycling + hydrogen seasonal buffer + diesel last-resort — three independent layers ensure zero downtime.
Project Outcome
A fully renewable island microgrid in Dubai — solar PV, BESS and hydrogen storage replacing diesel, with 5-day autonomous operation and zero grid dependency.
Off-Grid Microgrid Solar + BESS + H₂ Dubai, UAE Hospitality
Start Your Project

READY TO DEPLOY
YOUR BESS?

Tell us about your site, capacity requirements and grid connection — we'll propose the right solution within 1 business day.

Jan Misovic
Jan Misovic
Sales Manager
Discuss Your Project
We respond within 1 business day.