Industrial Sites & Parks with BESS.

BESS cuts energy costs, manages peaks, and stabilizes local grids for large consumers and business parks.
APPLICATION EXAMPLE

Smarter Energy for Large Consumers.

Large industrial sites and business parks face high costs, grid limitations, and power quality challenges. BESS provides the flexibility needed to optimize energy use, reduce expenses, and support on-site generation.
EXAMPLES OF

Detailed Functions.


  • 1. Price optimization: :

    Buy energy when it’s cheap, use it or sell it when prices rise.

  • 3.  Integration with on-site generation: 

    Balance PV, CHP, or wind to reduce external grid dependency.

  • 2. Peak shaving:

    Reduce reserved grid capacity costs by flattening demand peaks.

  • 4. Power quality improvement:

     Filter harmonics, stabilize voltage, and correct power factor.

OUR SOLUTIONS

Explore the Right BESS for Your Project.


M - Line

POWER FROM: 92 kW+ | CAPACITY FROM: 237 kWh+

This medium BESS uses a platform design that removes civil works, lowering costs and easing setup. Its modular design balances power, capacity, and cost efficiency.

R - Line

POWER FROM: 1.0 MW+ | CAPACITY FROM: 1.1 MWh+

This rack BESS uses a platform design that removes civil works, cutting costs and easing installation. Its modular build enables limitless scalability and efficiency.

C - Line

POWER FROM: 1.0 MW+ | CAPACITY FROM: 3.7 MWh+

This BESS modular solution has no limitations on maximum power or capacity. The choice of technology was based on achieving the best balance between cost and performance.

PROJECT CONCEPTS

Case studies.

Our case studies showcase potential approaches to different projects, offering inspiration and insight into how Volthein can adapt solutions to unique energy challenges.

Case Study

Ras Al Khaimah Water Plant Aims for 100% Green Power.

A mineral water factory in Ras Al Khaimah plans to fully power operations with local solar energy, using rooftop and nearby land to achieve 100% renewable electricity.

Case Study

Innovative Off-Grid Warehouse for 24/7 Operations

An international logistics hub near Amsterdam faces 15 GWh/year demand, but the grid can’t keep up, requiring a reliable on-site energy solution for 24/7 operations.

Case Study

Sustainable Island Power: A Microgrid Solution with BESS

Hotel complexes on the islands now rely on diesel. The goal: replace it with a self-sustaining microgrid powered entirely by clean, renewable solar energy.

Get in touch

Got a project in mind? Let’s design the right battery storage solution together.