EV Charging with BESS.

BESS ensures fast charging availability, reduces grid stress, and lowers infrastructure costs for EV hubs.
APPLICATION EXAMPLE

Powering Next-Generation Charging Hubs.

As e-mobility expands, high-capacity charging stations become essential. These hubs create short-term but extremely high demand peaks, which strain local grids and increase connection costs. BESS solves these challenges.
EXAMPLES OF

Detailed Functions.


  • 1. Load management:

    Reduce demand peaks, minimizing required grid connection size.

  • 3. High-power availability: 

    Ensure fast charging for trucks and buses, even where the grid is weak.

  • 2. Cost optimization:

    Lower both CAPEX for infrastructure and OPEX during operation.

  • 4. Grid protection:

    Minimize stress on local distribution networks, supporting DSOs.

OUR SOLUTIONS

Explore the Right BESS for Your Project.


M - Line

POWER FROM: 92 kW+ | CAPACITY FROM: 237 kWh+

This medium BESS uses a platform design that removes civil works, lowering costs and easing setup. Its modular design balances power, capacity, and cost efficiency.

R - Line

POWER FROM: 1.0 MW+ | CAPACITY FROM: 1.1 MWh+

This rack BESS uses a platform design that removes civil works, cutting costs and easing installation. Its modular build enables limitless scalability and efficiency.

C - Line

POWER FROM: 1.0 MW+ | CAPACITY FROM: 3.7 MWh+

This BESS modular solution has no limitations on maximum power or capacity. The choice of technology was based on achieving the best balance between cost and performance.

PROJECT CONCEPTS

Case studies.

Our case studies showcase potential approaches to different projects, offering inspiration and insight into how Volthein can adapt solutions to unique energy challenges.

Case Study

Ras Al Khaimah Water Plant Aims for 100% Green Power.

A mineral water factory in Ras Al Khaimah plans to fully power operations with local solar energy, using rooftop and nearby land to achieve 100% renewable electricity.

Case Study

Innovative Off-Grid Warehouse for 24/7 Operations

An international logistics hub near Amsterdam faces 15 GWh/year demand, but the grid can’t keep up, requiring a reliable on-site energy solution for 24/7 operations.

Case Study

Sustainable Island Power: A Microgrid Solution with BESS

Hotel complexes on the islands now rely on diesel. The goal: replace it with a self-sustaining microgrid powered entirely by clean, renewable solar energy.

Get in touch

Got a project in mind? Let’s design the right battery storage solution together.