Balancing Renewables with Battery Storage.

From smoothing production to energy shifting, BESS ensures stable integration of solar and wind into the grid.
APPLICATION EXAMPLE

Unlocking the Full Potential of Renewables..

Renewables are at the core of Europe’s energy transition, but their weather-dependent production introduces volatility. BESS ensures stable and predictable integration of solar, wind, and other renewables into the grid by absorbing fluctuations and providing stored energy when needed.
EXAMPLES OF

Detailed Functions.


  • 1. Smoothing production::

    Compensate for rapid PV or wind output drops, keeping the supply stable.

  • 3. Grid connection optimization

    Reduce the need for oversized connection capacity by using BESS as a buffer during peak hours.

  • 2. Energy shifting:

    Stabilize voltage levels and correct power factor without additional infrastructure.

  • 4. Improved power quality:

    Support distribution networks with frequency and voltage stabilization, avoiding costly reinforcement.

OUR SOLUTIONS

Explore the Right BESS for Your Project.


M - Line

POWER FROM: 92 kW+ | CAPACITY FROM: 237 kWh+

This medium BESS uses a platform design that removes civil works, lowering costs and easing setup. Its modular design balances power, capacity, and cost efficiency.

R - Line

POWER FROM: 1.0 MW+ | CAPACITY FROM: 1.1 MWh+

This rack BESS uses a platform design that removes civil works, cutting costs and easing installation. Its modular build enables limitless scalability and efficiency.

C - Line

POWER FROM: 1.0 MW+ | CAPACITY FROM: 3.7 MWh+

This BESS modular solution has no limitations on maximum power or capacity. The choice of technology was based on achieving the best balance between cost and performance.

PROJECT CONCEPTS

Case studies.

Our case studies showcase potential approaches to different projects, offering inspiration and insight into how Volthein can adapt solutions to unique energy challenges.

Case Study

Ras Al Khaimah Water Plant Aims for 100% Green Power.

A mineral water factory in Ras Al Khaimah plans to fully power operations with local solar energy, using rooftop and nearby land to achieve 100% renewable electricity.

Case Study

Innovative Off-Grid Warehouse for 24/7 Operations

An international logistics hub near Amsterdam faces 15 GWh/year demand, but the grid can’t keep up, requiring a reliable on-site energy solution for 24/7 operations.

Case Study

Sustainable Island Power: A Microgrid Solution with BESS

Hotel complexes on the islands now rely on diesel. The goal: replace it with a self-sustaining microgrid powered entirely by clean, renewable solar energy.

Get in touch