Volthein Energy | Final Mobile Responsive
Integration BESS Energy Management Applications
🇬🇧 🇩🇪 🇨🇿 🇵🇱
Let's Talk
Applications

EV Charging
Hubs.

EV Charging Hubs

FAST CHARGING WITHOUT OVERLOADING THE GRID.

Ultra-fast EV charging demands massive peak power — power most grid connections simply cannot deliver. BESS acts as a local energy buffer, making high-power charging possible without costly grid upgrades.

Volthein integrates battery storage directly into EV charging infrastructure — absorbing energy gradually from the grid and releasing it in high-power bursts when vehicles charge. The result is dramatically lower grid connection costs, reduced demand charges, and the ability to deploy fast chargers where the grid would otherwise not allow it.

Peak Shaving Demand Management Grid Buffering Fast Charging Cost Reduction Smart Dispatch
60%
Lower Grid Connection
Typical reduction in required grid connection capacity by using BESS as a power buffer at charging hubs.
350kW
Charger Support
Enable ultra-fast DC charging up to 350 kW per station — without requiring a dedicated HV connection.
24/7
Automated Operation
EMS continuously optimizes charge cycles, demand peaks and grid tariffs — no manual intervention required.
Detailed Functions

WHAT BESS DOES FOR
EV CHARGING HUBS.

01
Peak Power Buffering
Store energy slowly from the grid during off-peak hours and release it in high-power bursts when multiple EVs charge simultaneously — eliminating demand spikes.
Peak ShavingDemand Charge
02
Grid Connection Sizing
Reduce the required grid connection capacity by up to 60% — enabling fast charging sites in locations where the grid infrastructure would otherwise prohibit it.
Connection ReductionCAPEX Saving
03
Ultra-Fast Charging Enablement
Deliver 150–350 kW per charger from local BESS storage — supporting next-generation EV charging speeds without high-voltage infrastructure.
DC Fast ChargingHPC Support
04
Smart Energy Arbitrage
Charge the battery when electricity prices are low, discharge during peak tariff hours — reducing operational energy costs for the charging hub operator.
Price ArbitrageOPEX Reduction
05
Solar Integration
Combine rooftop PV with BESS at the charging hub — self-generate, store, and dispense green energy directly to EV drivers without grid dependency.
PV + BESSGreen Charging
Ready to start?
Tell us about your EV charging project — we'll design the right BESS solution.
Get In Touch
Recommended BESS

EXPLORE THE RIGHT SOLUTION
FOR YOUR PROJECT.

Two paths — standardised or fully engineered. Both delivered by Volthein with full lifecycle accountability.

S-Line — Standardised BESS
Standardised
S-Line
Deploy Fast.
Operate with Confidence.
Pre-engineered BESS blocks available in three performance levels — ESSENTIAL, STANDARD and PERFORMANCE. Faster time to revenue, CAPEX certainty, and target 99% availability.
Pre-delivery FAT & streamlined commissioning
CAPEX certainty — fixed pricing blocks
Optional warranty up to 15 years
24/7 monitoring & remote support
Explore S-Line
C-Line — Custom BESS
Custom
C-Line
When Standard
Isn't Enough.
Fully engineered BESS for projects with complex site constraints, non-standard interfaces, or specific control requirements. Every element is configurable within a validated framework.
Adapt to real-world site limitations
Single-source accountability
Custom PCS, battery & PPC integration
Full grid connection up to 400 kV
Explore C-Line
Not sure which solution fits? Talk to our team — we'll assess your project requirements and recommend the right path.
Let's Build Together

WHICH APPLICATION
FITS YOUR PROJECT?

Tell us about your site, capacity requirements and grid connection — we'll match the right application and technology to your project.

Jan Misovic
Jan Misovic
Sales Manager
Discuss Your Project
We respond within 1 business day.